Infrastructure ยท Private Infrastructure Requires Railways
Base
| Production method | Requires | Inputs | Outputs | Jobs | Net ยฃ / level |
|---|---|---|---|---|---|
Experimental Trains | โ | Engines5 Coal2 | Transportation20 | Laborers 600 Machinists 200 Clerks 200 | +240 |
Steam Trains | Steel Railway Cars | Engines5 Coal5 | Transportation25 | Laborers 500 Machinists 300 Clerks 200 | +300 |
Joint Steam Trains | Steel Railway Cars , Principle Transport 3 | Engines6 Coal6 | Transportation30 | Laborers 500 Machinists 300 Clerks 200 | +360 |
Electric Trains | Electric Railways | Electricity8 Engines5 | Transportation35 | Laborers 400 Machinists 350 Engineers 50 Clerks 200 | +510 |
Joint Electric Trains | Electric Railways , Principle Transport 3 | Electricity10 Engines6 | Transportation45 | Laborers 400 Machinists 350 Engineers 50 Clerks 200 | +690 |
Diesel Trains | Compression Ignition | Oil6 Engines5 | Transportation40 | Laborers 400 Machinists 300 Engineers 100 Clerks 200 | +660 |
Joint Diesel Trains | Compression Ignition , Principle Transport 3 | Oil8 Engines6 | Transportation50 | Laborers 400 Machinists 300 Engineers 100 Clerks 200 | +820 |
Passenger Trains
| Production method | Requires | Inputs | Outputs | Jobs | Net ยฃ / level |
|---|---|---|---|---|---|
Cargo Prioritization | โ | โ | โ | โ | โ |
Wooden Passenger Carriages | โ | Wood8 | Transportation10 | Clerks 100 | +140 |
Steel Passenger Carriages | Steel Railway Cars | Steel5 | Transportation15 | Clerks 200 | +200 |
Quantities are per building level at full employment ยท net uses base prices and counts flat lines only (percentage lines depend on the building's other methods)
Railway
Experimental Trains 


Steam Trains
Electric Trains 
Diesel Trains 
Cargo Prioritization
Wooden Passenger Carriages 
Steel Passenger Carriages 