Infrastructure ยท Construction Requires Urbanization
Base
| Production method | Requires | Inputs | Outputs | Jobs | Net ยฃ / level |
|---|---|---|---|---|---|
Wooden Buildings | โ | Wood75 Fabric25 | โ | Bureaucrats 100 Clerks 100 Laborers 800 | -2000 |
Iron-Frame Buildings | Urban Planning | Iron50 Wood40 Fabric20 Tools10 | โ | Bureaucrats 100 Clerks 100 Machinists 50 Laborers 750 | -3600 |
Steel-Frame Buildings | Steel-Frame Buildings | Steel50 Glass40 Tools20 Explosives10 | โ | Bureaucrats 100 Clerks 100 Machinists 150 Laborers 650 | -5400 |
Arc-Welded Buildings | Arc Welding | Steel50 Glass40 Tools40 Electricity40 Explosives20 | โ | Bureaucrats 100 Clerks 100 Engineers 50 Machinists 150 Laborers 600 | -7900 |
Quantities are per building level at full employment ยท net uses base prices and counts flat lines only (percentage lines depend on the building's other methods)
Construction Sector
Wooden Buildings 

Iron-Frame Buildings 

Steel-Frame Buildings 


Arc-Welded Buildings 